Telco Installation Case Study

Designed for Level 3 Availability

One of the Global leaders in International Telecommunications called in The PowerWorks project team when they were considering housing their major fibre-optic node for Western Europe. Planning to install their critical services within one of Europe's leading Co-location sites, the brief was to ensure 'Level 3' availability of Power Systems.

The site already housed parallel Generators and a 1.2MW Rotary UPS. The PowerWorks Technical team considered dual power paths without single point failure and were able to recommend the use of a dedicated 80kVA UPS to provide a second secure power supply to the load, and using twin static switch load transfer modules to provide UPS backed 'A' and 'B' supplies to dual fed racks within their secure enclosure.

PowerWorks team fully understood the standards of workmanship required

The PowerWorks team were contracted not only to supply the necessary equipment, consisting of 80kVA PW-3 UPS, 100A PW-LTM static switch, Twin distribution panels with Power Monitoring and Metering, but also to fully install the equipment, provide underfloor feeds to each rack cabinet and fully integrate the system with the Co-location site’s BMS, working on ModBus.

Work required installing new mains feeds from the building's power supply switch panel to the new UPS location some 70m away - cables were to pass through fire panels and structural walls.

High level work requires the use of specialist plant equipment carried by The PowerWorks

UPS output was to be split into two independent feeds. The UPS installation was completed with a PW-MBS external maintenance bypass system.

Supplies from the new UPS system were then installed to feed the new PW-LTM Static Switches on the data centre floor, on the level above. Similarly new supplies from the existing rotary UPS were installed to feed the second LTM.

pic7 pic8

Left Picture
LTM modules being installed with Distribution Panels within the secure area

Right Picture
Distribution panels complete with European standard cabling

Outputs from the two PW-LTM Static Switches were fed to new Distribution Panels, from where power was distributed underfloor as two independent feeds to each rack cabinet.

pic9 pic10

Left Picture
Underfloor distribution to rack cabinets

Right Picture
Earth bar

As with many such projects undertaken by The PowerWorks, time was extremely tight, and to complicate matters the customer was asking us to work simultaneously in three European locations - Hamburg, Brussels and Paris.

If you would like information on what PowerWorks can do for your company Enquire Here! alternativley Contact US!

item14b2a1

Enquiry Form

HOMEicon5enquiryup

Copyright © The Powerworks Limited. Unit A, Lake Works, Portchester, Hampshire PO16 9DH

Strapanimation
Eliminate the risk
UKASWebLogo1
NICEIC1
HOMEicon1ITROOMup
HOMEicon2UPSSYSup
HOMEicon3UPSPLUSup
HOMEicon4SERVICEup

UPS installed with Bypass System and output Distribution

LTM's and Distribution Panels, showing mains monitors with metering

PW-MBS Bypass System with output distribution module

item14b2a2

FREE Site Survey

ist26795293surveycloseup1
Home