Heathrow Airport
Case Study
Powerworks Powalite Powers the Way.
Heathrow Airport is among one of the busiest airports in the world, with approximately 1500 take-off and landings per day. The airports total power consumption is in the region of 80MW, of which lighting accounts for approximately 25%. Heathrow’s programme to reduce both CO2 emissions and power consumption of lighting led it to first trial and then install the Powerworks Powalite units on its stand and under-pier lighting. So far it has achieved an average 37% saving on consumed power and an equivalent reduction in CO2 emissions. Payback period is calculated at 3 - 5 years on all Heathrow installations, that includes all electrical installation work, maintenance and provision of an external bypass.
Copyright © The Powerworks Limited. Unit A, Lake Works, Portchester, Hampshire PO16 9DH
“I have been very impressed by the installation quality, and the competence and friendliness of the staff. Powerworks was clearly the right choice of contractor for the supply of this very important service provision. Once again thank you.”
Geoff Copping at Fujitsu Siemens