Copyright © The Powerworks Limited. Unit A, Lake Works, Portchester, Hampshire PO16 9DH
Redundant Power Systems
In today's critical 'Level 3' availability environment, redundant power systems are essential. Our technical project manager will consider n+1 redundancy of power supply, UPS and distribution, all backed by emergency generators We will select from our own range of parallel UPS and battery systems, static switches (or load transfer modules).
“Just a quick note of thanks for your input and work with the installation. The engineers were pleasant and hard working. All and all everything went as planned and like clock-work. The Client and ourselves are happy with the final product. A big thank you to everyone. We look forward to working with you again.”
Keith Korff at Emcor Facilities Services